Online Standards Store PDF
Living environment with planning elements accessible to people with disabilities
Document status: Active
Engineering surveys for construction. Basic provisions (amd. 02.02.2024)
Document status: Active
Design of overhead power lines with a voltage of 0.38 kV with insulated wires SIP-4
Document status: Active
Norms of maximum permissible deviations during acceptance of objects into operation
Document status: Active
Actions on structures. Part 1-6. General actions. Actions during execution (including cor. as of July 2008)
Document status: Active