Online Standards Store PDF
Regulations on the project management system 'General scheme for organizing the territory of the Republic of Kazakhstan'
Document status: Active
Determining the dimensions of land areas for the construction of flat and linear structures
Document status: Active
Hydrotechnical structures. Main design provisions
Document status: Active
Geological engineering surveys in problematic soils and hazardous geological processes development areas. Rules and regulations
Document status: Replaced by SHNK 1.02.09-21
Gas supply systems. Rules for performance and acceptance of works
Document status: Active