GOST
Hydro power plants. Part 1-7. Hydroelectric power station. The general requirements for repair and reconstruction of constructions and equipment
Document status: Active
Ceramic electrotechnical articles. Maximum deviations from nominal dimensions, surfaces form and locations
Document status: Active
Low-voltage electrical installations. Part 4-43. Protection for safety. Protection against overcurrent
Document status: Active
Test methods specific to filling compounds of electric cables. Drop-point. Separation of oil. Lower temperature brittleness. Total acid number. Absence of corrosive components. Permittivity at temperature 23 C. D.c. resistivity at temperature 23 C and 100 C
Document status: Cancelled
United power system and isolated power systems. Electric power systems. Operational dispatching control in power industry and operational technological control. Terms and definitions
Document status: Replaced by GOST R 57114-2022