GOST
Heating boilers. Part 3. Gas-fired central heating boilers. Assembly comprising boiler body and a forced draught burner. Testing of heat engineering
Document status: Active
Electrical installations of buildings. Part 7. Requirements for special installations. Electrical installations of buildings and structures with electrical heating of floors and surfaces
Document status: Active
Type R18 and R24 narrow-gauge railway rails. Technical requirements
Document status: Active
Dry construction plaster mixes based on cement binder with use of ceramsite sand. Specifications
Document status: Active
Storage systems. Adjustable pallet racking. General specification
Document status: Replaced by GOST R 55525-2017