Low - frequency, pulse transformers and rectifier filter chokes. Methods of measuring electric parameters
Document status: Active
Tests for electric cables under fire conditions. Circuit integrity. Part 1. Test method for fire with shock at a temperature of least 830 °C for cables of rated voltage up to and including 0,6/1,0 kV and with an overall diameter exceeding 20 mm
Document status: Replaced by GOST IEC 60331-1-2021
Shunt power capacitors of the non-self-healing type for a.c. systems having a rated voltage up to and including 1000 V. Part 3. Internal fuses
Document status: Active
Electrical installations of buildings. Part 4. Protection for safety. Protection against thermal effects
Document status: Active
Renewable power engineering. Wind power engineering. Wind turbines. Part 25-4.Communications for monitoring and control of wind power plants. Mapping to communications profile
Document status: Active