United power system and isolated power systems. Electrical networks. Ice-melting systems on conductors and ground-wire cable of the overhead transmission line. The choice and basis of principal technical solutions
Agricultural tractors. Requirements, test procedures and acceptance criteria for the operator's field of vision. Part 2. Field of vision to the side and to the rear