Electrical equipment and a. c. installations on up to 3 kV voltages and higher. Test methods of the electrical equipment insulation dielectric strength on the installation site
Carbon dioxide capture,transportation and storage. Part 2. Evaluation procedure to assure and maintain stable performance of post-combustion CO2 capture plant integrated with a power plant