Online Standards Store PDF
Uniform control methods for basic materials (semi-finished materials), welded joints and welding on of equipment and pipelines of nuclear power units. Ultrasonic testing. Part I. Control of basic materials (semi-finished materials)
Document status: Replaced by GOST R 50.05.05-2018
Equipment and pipelines of nuclear power units. Arc welding of aluminum alloys in protective gases. Main provisions
Document status: Active
General Safety Regulations for nuclear thermal power plants (SSB 88/97). Also known as NP-001-97.
Document status: Replaced by NP 001-15
General provisions for design and operation of emergency power supply systems of nuclear power plants
Document status: Replaced by NP 087-11
Recommendations for registration of the changed in operating conditions of the systems and elements of the nuclear fuel cycle facility shutdown at determination of the pssibility to reduce the scope of maintenance and implementation of the corresponding changes to the maintenance documentation of the nuclear fuel cycle facility
Document status: Active