Turkmenistan standards PDF

↑
St FIDIC Yellow Book (2nd Ed. 2017) Amendments 2022-11

Amendments to the Conditions of Contract for plant and design-build, for electrical and mechanical plant and for building and engineering works designed by the contractor. Includes the December 2018, June 2019 and November 2022 sets.

Document status: Active

€35
St FIDIC Silver Book (2nd Ed. 2017)

Conditions of Contract for EPC and turnkey projects. 2017 printing. Original English-language PDF.

Document status: Replaced by

€35
St FIDIC Silver Book (2nd Ed. 2017) Amendments 2022-11

Amendments to the Conditions of Contract for EPC and turnkey projects. Includes the December 2018, June 2019 and November 2022 sets.

Document status: Active

€35
St HD 308 S2-2001

Identification of cores in cables and flexible cords. Original standard HD 308 S2-2001 in PDF full version. Additional info + preview on request

Document status: Active

€35
St HD 361 S3-1999

System for cable designation. Original standard HD 361 S3-1999 in PDF full version. Additional info + preview on request

Document status: Replaced by

€35
St HD 361 S3-1999 A1-2006

System for cable designation — Amendment 1. Original standard HD 361 S3-1999 A1-2006 in PDF full version. Additional info + preview on request

Document status: Replaced by

€35
↑